How the shot went.
As a whole the shot was successful as we got all the filming done in one day, also the footage we got was of a good standard and would meet the requirements to be edited. Throughout the filming we only had a few problems, one being when we had to film the CCTV shots the tripod was not big enough to give us the shot we wanted, we overcame this by placing the tripod and someone to shoot the scene on a chair ensuring they were safely balanced. Another problem we encountered was when we filmed the establishing shot people could potentially interfere with the shot, we resolved this problem by getting members of the group to stand in areas to stop people getting in the way why we shot. As a team I believe we worked really well together as we managed to finish all the shooting in one day and all the scenes were of a high quality.
After re-watching the footage I can say we had to do no retakes as the footage was of a good standard. I feel our technical execution was of a good quality as we ensured we had a sufficient amount of takes for each shot, this meant at least one would fit the standards we required. We abided by the rules of continuity as we got all the filming doe in one day so we had the same clothes on throughout. We also ensured we followed the 180 degree rule aswell.
No comments:
Post a Comment